Welcome To The
Principality of Hutt River
www.principality-hutt-river.com
 

 

 Drilling for Water

(Click Thumbnails to Enlarge)

 

Arriving

The crew arrives with the heavy equipment.

   
Drill comes up the drive The drill & trailered compressor Big air compressor!
Another view of the Drill rig Big Detroit diesel & huge fan.
 

 

At Work

The rig is erected and drilling commences using a diamond tipped drill bit.

Drill erected. In place ready to go. Drilling commences.
Drill control panel. Watching it work is HRH Prince Ian
(in the checked shirt).
At work! Broken diamond bit!
Compressor bought down to the site by HRH Prince Ian
 

 

Strike

Water gushes to the surface!

   

 

   
   
Strike 1!   Thar she blows!   Hutts liquid gold.
     

 

   
Casing
         
   
112mm (5") plastic casing is lowered into the drill hole   HRH Prince Leonard checking progress   Casing continues to be inserted
         
   
etc   etc   etc.
 

 

Spear
The Spear is now lowered into the casing This spear will remain in place as the pipe through which the water will be pumped up Additional length of spear is hoisted ready to be attached.
Spear top attached to the drill drive head Additional spear pipe is joined to the end of the previous length.
Complete!

The Windmill completed and pumping water!

(Click Thumbnails to Enlarge)
 

 

 